SOC 2 CC6.1 / CC6.6 / CC8.1 VENDOR APPROVAL DOSSIER
msproject-mcp (PyPI MCP)
Approved Version Pin:
0.7.2 · Source: PyPI Registry · Checked: 2026-11-13GO ยท CLEAN
OSV.dev CVEs (CC6.6)
PASS (0 CVEs)
Install Hooks (CC6.6)
PASS (None)
SLSA Provenance
Not attested
Maintainers / Deps
1 owners · 5 deps
Deprecated Status
Active
Package Integrity Digest (SHA-512 / SHA-256): sha256-370df01c79337024b20b41a132142c0af9b5b7d233ffa13377ed53a1eafe7ade
Forensic Evidence Findings
- Pinned 0.x release (0.7.2)
- Artifact SHA-256 verified (sha256-370df01c7933702...)
- Prebuilt PyPI wheel (.whl); zero install-time setup.py code execution
- Verified GitHub source repository linked
Recent Version & Lifecycle Drift Events
- No adverse version or install-hook drift alerts recorded since last check.
IT / Security Reviewer: ___________________________
Review Date: _______________
Review Date: _______________
Continuous Drift Protection
Auto-block silent
Subscribe Free Drift & Hook Alerts (/drift.xml) →
Auto-block silent
postinstall pushes in GitHub PRs.Subscribe Free Drift & Hook Alerts (/drift.xml) →