@critical-path/mcp (npm MCP)
Category: mcp_server · Network/Host: npm Registry · Version Pin:
0.26.2
GO ยท CLEAN
Point-in-Time Telemetry Signals
- Pinned 0.x release (0.26.2)
- Zero insecure flags in npm registry telemetry
- Verified GitHub source repository linked
- 9,178 monthly npm installs
EMBED LIVE VERSION-PINNED README BADGE (FREE)
Last checked: 2026-11-11T11:04:20.491Z · Source ID:
@critical-path/mcp@0.26.2
· Target: https://github.com/Pixerate/critical-path
A service of Shinn Company LLC. Point-in-time automated software & ledger telemetry pinned to 0.26.2; any unverified push requires re-verification. Not a consumer credit report.